As part of the IQ Program-Wide Consultant Construction Management and Inspection Services Program, MCSS worked with Jacobs (formerly CH2M) on a project involving the modification of the Kings Highway Interlocking using Solid State Interlocking (SSI) technology. The work also included constructing a new relay room above the elevated Culver Line tracks and installing UPS, fire suppressant equipment, fire alarm systems, and related components. MCSS supported the project by providing signal system installation inspections for various signal equipment, such as signal cables, cases, I-J joints, and signal heads. Additionally, MCSS personnel inspected the internal wiring of signal equipment to ensure proper installation and adherence to safety standards.
Construction costs over $200M